Tuesday, September 15, 2026
One thing needs attention, one is noted, the rest is fine.
- Downspout loose at the northwest corner (item 4). Your gutter company should fix it before the first rain. It’s under your limit, so we’ll book it unless you say no.
- Path light out (item 9). Bulb ordered; we’ll replace it next visit.
Outside
- 1Approach, gates and drivewayFine
Gate closed and latched. Driveway clear. No flyers, nothing on the step.
- 2Mail and packagesFine
Four letters and one small box collected and placed on the hall table as agreed.
- 3Doors and windows, outsideFine
All locked. Screens in place.
- 4Roofline and guttersNeeds attention
The downspout at the northwest corner has come away from the gutter (photo). In the first rain, water will run down the wall. Your gutter company should come before then. It should be under $150, inside your limit, so we’ll book it unless you tell us not to.
- 5Walls and eavesFine
No new stains. No nests.
- 6Landscaping and irrigationFine
Soil damp at the beds on the west side, dry on the east, matching the Tuesday and Friday schedule.
- 7Pool and spaFine
Water level normal, clear, pump running, pad dry.
- 8Hose bibsFine
Dry.
- 9Exterior lightingNoted
Porch light on its timer. The path light nearest the street is out; bulb ordered, replaced next visit.
- 10BinsFine
Stowed behind the side gate.
And 30 more items: inside, the systems, and closing up.